Year 2019 Representative Projects

Private

Banco de Oro Electrical works
  • Replacement of 2 x ACB MGM50H1 Rated 5000 Amps to NW50H13D2A including common and extension busbar with mechanical lugs (14 x 250mm2 Lugs per Phase)

  • Supply and installation of main circuit breaker and preparation of electrical as-built plans
    BDO Dasmariñas Binondo, Mla.

  • Installation of 6-5TR FM inverter type ACU electrical works
    3rd Floor DCO Makati City

  • Installation of new 30KVA UPS unit
    6th Floor Dasmariñas Binondo, Manila

  • Rehabilitation of main electrical room and metering center
    2nd FLoor BDO Dasmariñas Binondo, Manila

Year 2018 Representative Projects

Government

City of Lipa, Batangas PABX and structured cabling
  • Supply and installation of 1 lot pabx, voice and data structured cabling

FDAS
  • Supply and installation of 1 lot fire alarm & detection system

Private

Dasmariñas Village Association Electrical designer and consultant
  • Electrical design of street lighting

Electrical works
  • Electrical installation of Dasmariñas Village Association (DVA) street light

Year 2017 Representative Projects

Private

Primehomes Real State Development, Inc. Electrical Designer & Consultant
  • Electrical and auxiliary design of La Rosa Project

ARCONIC Electrical Designer & Consultant
  • Electrical and auxiliary design of Manila North Harbor Port, Inc.

Antonio de Castro and Angelo de Castro Construction works
  • Proposed 2-storey residence expansion renovation with deck
    Blk. 559 Lot 6 D. de Castro St., Zaniga Subdivision Mandaluyong City

Addas Group of Companies Construction works
  • 25 units housing construction
    Villa Felicia Subdivision, Bayanan, Bacoor Cavite

Addas Group of Companies
Penthouse Adio Centre
Aquinaldo Highway, Talaba
Bacoor Cavite
Construction works
  • 20 units housing construction
    Villa Felicia Subdivision, Bayanan, Bacoor Cavite

Government

Department Of Health—Main
San Lazaro Compound
Rizal Ave., Sta. Cruz, Manila
Electrical works
  • Upgrading of DOH Distribution System and other electrical related projects

Year 2016 Representative Projects

Government

Bicol University
Legaspi City
Electrical plumbing and water station
  • Supply, delivery and installation of water purifying for BU Spring Water Project of BUCSSP

San Lazaro Hospital
Quiricada St., Sta. Cruz, Manila
PABX and structured cabling
  • Replacement and rehabilitation for PABX system of SLH Voice Center

Private

Banco de Oro Electrical works
  • Electrical Backbone of 22-Storey with 4 Basement and Roofdeck BDO South Tower, H.V. Dela Rosa St., Makati City

  • Installation of Electrical Works
    Data Center Operations
    BDO Ground Floor & 2nd Floor Bldg. 1

Southeast Asian Medical Center Electrical works
  • Installation of Electrical Works

Year 2015 Representative Projects

Government

Civil Service Commission Central Office
Constitution Hills, Diliman, Q.C.
Electrical plumbing and water station
  • Supply and Installation of 24-Stages Water Purification Equipment, including Electrical and Plumbing Connection

University of Northern Philippines
Vigan City, Ilocos Sur
Electrical works
  • Supply of 3 Units 250KVA Distribution Transformer Primary Voltage: 7620/13200 Volts., Wye: Secondary Voltage 120/240Volts, 1 Ø, 60 Hz.

Private

Citibank Savings Inc.
Corporate Realty Services (CRS)
17th Floor Citibank Tower
Electrical works
  • Electrical Works
    16th Floor Citibank Tower

Banco de Oro Electrical works
  • Electrical Backbone of 4-Storey Building
    BDO Remittance, Gil Puyat Ave., Makati City

  • Re-Installation of 100 KVA UPS
    Makati Data Center

St. Paul Hospital Cavite
Dasmariñas, Cavite
Electrical works
  • Installation of electrical Works